top of page
How much patch 2.jpg
Why and Where on black.jpeg
Bag area chart 3.jpg

When working with an area that is deeper than 2 inches, we recommend

filling and tamping the hole in 2 inch layers.  


The 1 inch crown (mound) above surface level allows for proper compaction

and the repair will be open to traffic immediately.

FREE bag banner.png

B. METCALF GEM PATCH IS DOT APPROVED!

Smaller.jpg
bottom of page